Principles of Screening and SizingExplore further
2016-1-12 · • Maximum bed depth at discharge end is 4x the separation. • If too thick, probability is decreased for sized aggregate to properly stratify and pass through an opening. • Minimum bed depth is 1x the separation. • If too thin, material can bounce, stay suspended and not stratify or find an opening, thus reducing accuracy.
Get Price